Skip to content
SurenoGet Sureno Browser
← Sureno News

$50 Billion Needed to Replace Aging FAA System After Nationwide Travel Shutdown, Duffy Sounds Alarm

Why flights were paused

Duffy said the FAA detected instability in radar and communications equipment at about 3:36 p.m. ET on Friday. The agency responded with a nationwide ground stop, which he described as a precaution.

He blamed old routers, switches and copper lines for the disruption. In remarks at a White House news conference, Duffy said the infrastructure includes technology dating back decades.

A $50 billion request

Duffy urged Congress to approve $50 billion in emergency funding for a full rebuild of the air traffic control system. He presented the request as a national concern, not a partisan one.

Modernization already underway

Earlier FAA upgrades have included a contract worth nearly $5 billion, awarded to Rohde & Schwarz USA in April, to replace as many as 462 voice communication switches. More than 40 new switches had been installed, according to FLYING magazine.

Federal officials have also reported replacing about half of the old copper wiring used for radar and communications data with newer connections. Duffy nevertheless warned that the broader system remains at risk without a complete overhaul.

Key points

  • Duffy says radar and communications instability prompted Friday’s nationwide FAA ground stop.
  • The transportation secretary is seeking $50 billion from Congress for a full system overhaul.
  • Existing upgrades include new voice switches and replacement of about half the aging copper wiring.
  • Duffy says newer equipment has avoided the failures affecting older infrastructure.
Read the original on Fox Business ↗

More news

Loading stories…